- System Service Reliance Plans
- Training Services
- Specialized Support Services
- Brochure: Bioprocessing Systems Services
Bioprocessing Systems
|
Factory Acceptance Testing (FAT)
The first step in your system’s service journey is making sure it is fully-tested for compliance with your technical and functional specifications – before it leaves the factory. This extensive testing off-site helps to ensure quick and easy acceptance once the system arrives at your site. |
Site Acceptance Testing (SAT)
After your system has been tested at the factory, it makes its way to you. Once it arrives, our engineers will work with you to perform a site acceptance test to ensure that the system’s performance and functionality was not impacted by the transport and installation on site. Enjoy peace of mind, knowing that your system will deliver high performance at every step of your process. |
|
Installation Qualification and Operational Qualification (IQ/OQ)
Once the system has been site accepted, the IQ/OQ is performed. This step is critical in ensuring that your system is fully operational to your exact specifications, and that operation is documented and compliant with all pharmaceutical regulatory requirements. |
Performance Qualification (PQ)
The last step in the process is to ensure that the system functions as intended, for your specific process. During our Performance Qualification (PQ), a trained biomanufacturing engineer will prepare the equipment and support both an engineering run and an actual run of your process recipe, giving you the confidence you need to fully qualify and implement your new system. |